How to install the LCD video wall

How to install the LCD video wall

LCD video wall is more and more popular in the digital signage. Today, let's talk the process installation of the LCD splicing screen.


1: First of all, confirm the fixed mode of the LCD splicing screen, using the floor bracket or cabinet, or wall hanging, measure the distance between the bracket and the back wall (the maintenance space behind can accommodate at least one person).

lcd video wall

2: The bracket must be firm, according to the size and number of the LCD splicing screen to determine the bearing weight, is generally 1.5 times the weight of the screen, so that the upper and lower left and right before and after are stable.

3: Install the screen after the support is installed. The screen installation sequence is from left to right and from bottom to top. Adjust the gap between the screens to ensure the horizontal and vertical.

4: The screen is installed after the wiring, splicing screen is generally used to do the control line, each screen is connected in series with the network cable, the first screen of the network cable to be connected to the serial port on the computer, so that you can control the whole screen.

video wall

5: Signal cable connection: each screen needs to be inserted into the signal line, now the world is more used is HDMI HD line, the signal line on the screen are connected to the distributor or matrix or multi-screen processor, so that each screen can complete the display image.

6: debugging phase: after the screen power, you can debug the screen, through the computer serial port each screen display address code, the location of the distribution screen, to its launch instructions, screen debugging is completed.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy