LCD Video Wall Installation Procedures
Beloong Group, as the leading manufacturer, wholesaler, engineering project contractor, and constructor of Commercial Display Equipment in China, has undertaken many large-scale key engineering projects at home and abroad, and has cooperated with the government on numerous projects. Experience professional and thoughtful service.
This time we use Splicing Screen as an example.
LCD Video Wall procedures of installation:
1. Use two-wire gradienter to determine the position of the Hydraulic Brackets. Then hang on the Hydraulic Brackets.
2. Arrange all the cables and wires onto the Brackets, with the nylon cable ties.
3. Hang the Splicing Screens from the bottom to the top. (Please don`t do the opposite way.)
Meanwhile connect the wires between Screens, and connect the power cables.
4. After installation, do test the gap between each LCD Splicing Screens.
Notice: 1. Do catch the handle at backside to hang the Screens, don`t press the LCD Screens by fingers!! It`s very important!!!
2. The installation workers should not wear watches or accessories.
3. Don`t rip off the protective plastic on each Screen, after the testing by government, you can rip off the protective plastic.