What should pay attention to when installing the touch query all-in-one machine correctly?

What should pay attention to when installing the touch query all-in-one machine correctly?

11-05-2022

The all-in-one touch inquiry machine is a commonly used smart device in many enterprise application scenarios. If you just received the all-in-one touch inquiry machine, you need to install it for the first time. New users may not know how to install it. So let Beloong tell you how to install the all-in-one touch inquiry machine.


touch screen


Specific installation steps:

1. After opening the package, first place the body of the touch and query all-in-one on a stable place, and place the base on a flat ground.

2. There are four screws on the back of the touch and information kiosk, screw the screws into each hole, and confirm whether they can be tightened.

3. Lift up the touch query all-in-one machine and align it with the four hanging holes on the base plate, and hang it from top to bottom.


digital signage

4. After confirming that it is hung up, plug in the connecting wire, plug in the power supply and turn it on to use it.

5. Before cleaning the screen of the all-in-one touch inquiry machine, turn off the machine and unplug the power cord to ensure that the machine is turned off, and do not use spray directly on the screen.

6. The touch screen should always be kept clean. If there is dust and dirt on the surface, it can be scrubbed with a towel or softer items, or it can be cleaned without corrosion to the touch glass.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy